Project management for shipyard in Durban, South Africa

By April 17, 2018Case Study

The new owners commissioned us to write a specification, negotiate the contract and oversee a 7 million US$ refit and extension of the vessel in the ship yards of Southern African Shipyards Durban, South Africa. The scope of work included, lengthening the vessel by 50Ft by means of a plug, lengthening of hanger deck by 30 ft, addition of 16 new cabin spaces, built to VIP specification, purchase and install two new Cat 3508 Main engines, two 150 KVa generators, New wet exhausts for all new engines, carry out intermediate Class survey, build new deck fridge/ freezer into old ballast tank, Fit new 30 ton Fassi crane, extend Helideck, fit new Orbit V sat and TVRO systems, update VOIP / IT and digital phone systems, Fit new deck hydraulic winches and power packs, Upgrade dive system to Mixed gas system, Instigate new engine room ventilation system, install High end Video edit room and dive camera storage Replace over 22 tons of failed steel in ships plate and frames. Full underwater paint, fit new propellers and a full hull and superstructure paint job. On time ( 6 months ) and under budget.

en_USEnglish